Contact Us
TEL: +86-21-31596560
E-mail: snow@dewater123.com
Address: Hualong Road No.1777 Block D, Room 302 Qingpu Shanghai China.

Dewatering Of Sludge

TRP411D D ewatering P lant Introduction TRP411D Dewatering plant adopt a unique separation technology. It’s brand new dewatering technology, which enables self-cleaning automatically for the filter gaps during sludge thickening and dewatering. Meanwhile this machine has stable and constant...

TRP411D Dewatering Plant Introduction
TRP411D Dewatering plant adopt a unique separation technology. It’s brand new dewatering technology, which enables self-cleaning automatically for the filter gaps during sludge thickening and dewatering. Meanwhile this machine has stable and constant capacity without depending on high pressure backwash water to prevent clog. This self-cleaning system enables TRP sludge dewatering press to be a good machine for oily and grease sludge.
立丰样本8P-2.jpg

立丰样本8P22-2.jpg

 

The thickening and dewatering zone is composed of stainless steel screen bars and triangle rotors , they are interlaced with each other. The triangle rotors are all penetrate through the gaps between screen bars ( ≤ 1mm ). 
During operation, the triangle rotors rotate slowly to transport sludge forward and the filtrate flows down through the gaps. During rotation, the triangle rotors are also cleaning the gaps between screen bars, so there is no chance for clogging.

 

TRP411D Dewatering Plant Working Principle
立丰样本8P-3.jpg


Mixtures of solids and liquids are poured into the upper section of the machine, the movement of triangle rotors separates the solids and liquids. Furthermore, through the continuous rotation of multiple triangle rotors, separated solid is transferred, meanwhile innovative design prevents the clogging.

 

TRP411D Dewatering Plant Main Features
1. No clogging
Continuous rotating the triangle rotors between the pressing plate, it causes high efficient separation from stock solution into liquid and solid at the same time, self-cleaning is occurred.
2. Stable treatment capacity
Continuous self-cleaning automatically for the filter gaps prevent the clogging, so it is guarantee the stable treatment capacity.
3. Large transport capacity
The triangle rotor plates runs smoothly in a wave-shape, which causes large transport capacity.
4. Operation is easy with high energy saving
Driving motor is high energy-saving, and it is very easy operation by using (ON-OFF) switch only.
5. Easy maintenance
Since structure is quite simple, maintenance is also easy.

222本.jpg

 
TRP411D Dewatering Plant Case Study
Manufacturing Wastewater
Model:  TRP411D           
Location:  Jiangsu, China
Sludge Type: Chemical Sludge      
Sludge Concentration : 1.5%
Sludge Flow Rate : 1.3m³/h
Ds Throughput : 19.5kg-DS/h
Polymer Add Rate: 120L/h-0.1%

房1.jpg
  

Food Processing Wastewater  
Model:  TR711                   
Location:  Zhejiang, China 
Sludge Type: DAF Sludge
Sludge Concentration : 3.0%
Sludge Flow Rate : 5.2m³/h
Ds Throughput : 156kg-DS/h
Polymer Add Rate: 795L/h-0.1%

房2.jpg

 

Pig Manure Wastewater                  
Model:  TR711               
Location:  Zhejiang, China 
Sludge Type: DAF Sludge
Sludge Concentration : 3.0%
Sludge Flow Rate : 4.3m³/h
Ds Throughput : 129kg-DS/h
Polymer Add Rate: 765L/h-0.1%

房3.jpg

 

Cattle Manure Wastewater    
Model:  TR711                       
Location:  Shandong, China                 
Sludge Type: Precipitation pond sludge          
Sludge Concentration : 4.0%
Sludge Flow Rate : 6.0m³/h
Ds Throughput : 160kg-DS/h
Polymer Add Rate: 790L/h-0.1%

房4.jpg

 

Palm Oil Industry Wastewater
Model:  TRP411D                 
Location:  Malaysia
Sludge Type: Chemical Sludge   
Sludge Concentration : 1.5%
Sludge Flow Rate : 1.3m³/h
Ds Throughput : 27kg-DS/h
Polymer Add Rate: 112L/h-0.1%

房5.jpg

 

Paper Making Wastewater
Model:  TR711                 
Location:  Zhejiang, China 
Sludge Type: chemically precipitated sludge
Sludge Concentration : 1.97%
Sludge Flow Rate : 7.0m³/h
Ds Throughput : 138kg-DS/h
Polymer Add Rate: 783L/h-0.1%  

房6.jpg    

 

TRP411D Dewatering Plant FAQ
1.Q:Are you trading company or manufacturer ?
We are factory.


2.Q:How long is your delivery time?
Generally it is 15-20 days if the components are in stock. or it is 20-40 days if the components are not in stock, it is according to quantity.


3.Q:What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment.


Hot Tags: dewatering of sludge, China, manufacturers, suppliers, factory, wholesale, price, discount
Inquiry